網(wǎng)站首頁技術(shù)中心 > CD-800 Dicing Machine               Instruction
產(chǎn)品目錄
CD-800 Dicing Machine               Instruction
更新時間:2013-07-29 點擊量:3542

This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

女性扒开大腿露出私密部位| 大肥波bbwwhbbww| 永久939W75W75W乳液| 把头埋入茂密的两腿之间| 娇小白人女vs巨大黑迪克| 亚洲欧美国产精品专区久久| 国产成人精品视频a片西瓜视频| 天天人人爽人人爽人人爽动漫| 波多野结衣52部合集在线观看| 亚洲永久无码7777kkk| 97精品国产97久久久久久免费| 欧美精品在线观看| 律师的小秘书1v1h| 亚洲精品无码一区二区| 精品久久久久成人码免费动漫| 欧美精品一区二区少妇免费a片| 奶头被医生摸得受不了| 欧美性受xxxx88喷潮| 巨大巨粗巨长 黑人长吊| 无码jk粉嫩小泬在线观看欧美| 公交车上荫蒂添的好舒服视频| 美国式禁忌3| 国产人成视频在线观看| 中国极品少妇xxxxx| 国产一区二区在线视频| 在厨房我撕开岳的丁字裤| 欧美性生交xxxxx无码小说| 午夜18禁试看120秒男女啪啪| 美妙人妻系列| 在线免费看电影| 被绑在机器上榨精失禁男男| 最好朋友的老公上我了怎么办| 亚洲精品无码高潮喷水在线| 欧美zc0o人与善交| 疯狂做受xxxx国产| 少妇和大狼拘作爱a片| 国产+成+人| 人妻丰满熟妇av无码区hd| 夜夜性日日交xxx性hd| 刺激的至亲乱45部| 欧美一性一乱一交一视频|